Project Name

FEATURE SURVEY FOR THE PROPOSED NGUALLA SOUTHERN ACCESS ROAD UPGRADE PROJECT SITUATED IN NGWALA VILLAGE IN SONGWE DISTRICT, SONGWE REGION.
  • Client : Peak Resources/Mamba Minerals
  • Category : Mining Sector
  • Location : Songwe

Project Name

Short Description.

Ngualla Rare Earth Project (the Project) is one of the world’s largest and highest-grade undeveloped neodymium (Nd) & praseodymium (Pr) rare earth projects.

The Project is centered on the Ngualla Carbonatite in southern Tanzania, 147 km from the city of Mbeya on the edge of the East African Rift Valley.

The project Definitive Feasibility Study (DFS) completed in 2017 determined the Eastern Access Road was the best option for the project. Peak has subsequently made the decision to reconsider the Southern Access Road for the Ngualla Rare Earth project due to its importance to the local community and governmental considerations.

Service provided in this assignment included the following:

  • Performing Topographic Survey
  • In situ Testing (DCP)
  • Soil sampling
  • Laboratory Testing includes Soils Classifications, Consolidation tests, Chemical tests
  • Borrow pit investigation
  • Preparation of Final Report